=

ads

Search This Blog

Translate into in your own Language

Crane Critical lifting is one of the hardest forms of lifting in the Construction industry and process safety.

Lack of communication in the lifting may cause of the heavy accident & cause of fatal accident also. Instability of crane,
Inadequate maintenance or inspection, Improper load rating and unguarded swing radius and other factors are also cause of accidents. The brief details are addressed in Microsoft Presentation.


The Main Points in the PPT are:

âž«    Major causes of Accidents
âž«    How do Accidents Occur
âž«    Hazards
âž«    Planing before Start-up
âž«    Who is a Competent Person
âž«    Crane and its Operator
âž«    Who to inspect?
âž«    Damaged Wire rope
âž«    Damaged Web Slings
âž«    Load capacity -Speed -Warnings
âž«    Load moment indicator
âž«    Limiting factors
âž«    Lifting Process
âž«    Load example - 30 ton
âž«    Improper Slinging/computation of load
âž«    Rigging
âž«    Lifting Plan
âž«    Rigging Requirements
âž«    Quarterly Color coding 
âž«    Hand Signal
âž«    Barricade Affected Area
âž«    Rigging and Slinging
âž«    Battening Down
âž«    Man Basket Operation
âž«    Summary of the Presentation 

10 comments:

  1. please send it to me at b_goudjil@yahoo.fr i can't download

    ReplyDelete
  2. Please send me latheefpovil@gmail.com

    ReplyDelete
  3. Excellent. Please send to cgamarraa@yahoo.com

    ReplyDelete
  4. Big help to me if only I can download the presentation. Please send to my email apdonaldo@gmail.com
    Thanks.

    ReplyDelete
  5. Pls allow send to me az.jmir@gmail.com

    ReplyDelete
  6. Send me on my mail please
    josephantonydino@gmail.com

    ReplyDelete